Ashford Designer Village

Our specialist Metropolitan team were called upon to complete a ...

Pump Bearing Change

Metropolitan Services was asked by CBRE to carry out a ...

Baker Street Bus Bar Monitoring

Power quality analysis can be useful to assist in the ...

Busbar Replacement

Metropolitan were employed to survey a water-damaged Busbar for an ...

Boardroom table refurbishment

Metropolitan were approached by an elite-level client in financial services ...

Replacement & upgrade of main LV switch panels

Telstra had planned a preventative maintenance works of their London ...

TEGG energised maintenance survey

The Metropolitan TEGG department performs bespoke and comprehensive trending analysis ...

Restore PLC Fit Out

Restore’s new CEO tasked Metropolitan to redevelop their 4000sqf central ...

De-energised maintenance works

The Metropolitan TEGG service department provides a highly-efficient de-energised maintenance ...

Cable verification survey

The client required a thorough cable verification survey due to ...

L12 DB Replacement Works

Metropolitan were employed to carry out distribution board replacement works ...

Thermal survey of underfloor heating

A client needed to drill holes in the marble-tiled concrete ...

Level 27 Refurb

A major UK Bank required a refurbishment of the 27th ...

Huddle Meeting Area Screens

The client required a ‘huddle room’ installation within the middle ...

Tiered seating and Credenza

The client required the manufacturing of a birch plywood credenza ...

Presentation & Collaborative Area

A leading financial services company required a rapid fit out ...

Custom Meeting Room Tables

After moving into newly refurbished Canary Wharf offices in 2018, ...

BMS Installation Newcastle

An in-depth Building Management System (BMS) survey at a Financial ...

Level 28 Refurb

A leading UK Bank required a refurbishment of the 28th ...

UPS Load Migration

One of the world’s largest IBX data centre and colocation ...

Northolt PDU rescue

Leading UK facilities management provider ISS called on Metropolitan Services ...

Northolt Data Centre

A major investment bank and existing client of Metropolitan required ...

Bespoke furniture

After completing an extension to their residential property, a key ...

Emergency flood response

As the facilities management provider for this multinational finance and ...

Case study - Tesla Chargers

One of the world’s largest multinational investment bank and financial ...

Bank Of America - Bromley

Bank of America recognised that its large office premises in ...

Infrastructure upgrade for Credit Suisse

Metropolitan were called upon by ISG to perform a complex ...

Westferry Circus

A major player in the financial services industry required a ...

Case study - Joinery

Project backgroundA large media organisation required new AV walls and ...

Floor Refurbishment Project

Project brief was to create an agile and dynamic workspace.Removal ...

10 South Colonnade

The project consists of the complete strip out of levels ...

M&E Rocket Theatre

Product Description Faced with the difficult task of refurbishing the ...

M&E Royal Academy

Metropolitan Services have recently completed a Boiler House Installation project ...

Critical Power Services - Life Safety Replacement Project

Having worked for our London Based Clients for 18 years ...

UPS Busbar Joint Failure

Metropolitan TEGG was initially called out to site after a ...

Mechanical - 15 Colmore Road

The building benefited by updating the existing services to embrace ...

Datacenter Works

Metropolitan Mechanical were awarded a contract to work alongside the ...

TEGG Testing

Metropolitan TEGG business unit was engaged in a 3 year ...

Busbar Failure

Our willingness to exceed expectations came to the fore during ...

Ventilation -Aquascutum Store

After our tender bid to Elliott Thomas, for complete M ...

FM Services - Nomura

The provision of a whole range of Facilities Managed services ...

Fixed Wire Testing -BP

We were approached by BP to provide a Periodic Testing ...

General Construction - Nomura

With Nomura’s relocation to new offices they decided to re-think ...

School Fit Out - Camden

Metropolitan Mechanical services are working for main contractor BAM on ...

Air Conditioning

Due to our in depth building knowledge and following a ...

PAT Testing Project

Having worked within the Canary Wharf campus for a number ...

TEGG - Paris Data Centre

Metropolitan was engaged in a 3 year energised proactive & ...

Framework Contract

Metropolitan are currently providing electrical, mechanical and ceiling services associated ...

DC Cable Replacement

Product DescriptionDuring the First of three annual Tegg Preventative maintenance ...

Managed Services

Working closely with the incumbent Maintenance Contractor, as well as ...

Plumbing Services - AkzoNobel

We have recently completed a mechanical package at Akzo Nobel’s ...

Fire Alarm System -DTZ

Following a successful tender process, we were asked to provide ...

Simmtronic Lighting Controls Installation -DTZ

During the course of a Cat A fit out for ...

Security - Private Client

With the rise in crime and theft we have seen ...

CATB Fit out for Morgan stanley

CAT B fit out for Morgan Stanley (ISG Contract)15, West ...