Our Work

Recent projects completed by Metropolitan

Image
Image
Image

Latest Project

HMLR Lighting Replacement Project

Metropolitan Services have successfully completed a considerable lighting installation to a 7 storey HMLR building in Hull.

4 Aug 2021

HMLR Lighting Replacement Project

Metropolitan Services have successfully completed a considerable lighting installation to a 7 storey HMLR building in Hull.

15 Jun 2021

Toltec UPS Recommissioning

Six years ago one of our major colocation Data Centre customers moth-balled one of their UPS supply streams as part of a cost saving exercise.

1 May 2021

Trader Floor Pan Assembly Faults

The problematic units were supplying the company's trading floor, which gave additional risks to critical daily business operations and continuity.

30 Nov 2020

Infrastructure Upgrade

Infrastructure Upgrade

31 Oct 2020

Riverbank House Lift Lobby Lighting

Replacement of Lighting for Energy Efficient Alternative and Controls

15 Oct 2020

Touchless Washroom

The project was to create a touchless solution, whereby the end user could access a washroom without the need of having to physically touch door handles, toilet flushes, taps and soap dispensers before exiting.

28 Aug 2020

Wembley Stadium LV Infrastructure

LV Infrastructure for Floodlights and Lifts

10 Aug 2020

Heating System Replacement

Installation of Low Loss Header, Heating Equipment, Controls and Associated Pipework

4 Aug 2020

Electrical Testing - Large Financial Client

Completion of 5 Year Testing and Inspection Regime

2 Jul 2020

AHU / VAV Overhaul

Lifecycle Refurbishment of Air System Components

17 Jun 2020

Strip Out Works

Three Floors to be stripped back to Shell & Core

14 Jun 2020

London Data Centre

Annual Planned Maintenance on Live Data Centre Infrastructure

14 Jun 2020

Porsche EV Supercharger

Installation of New EV Chargers and Porsche Supercharger

17 May 2020

Data Suite Power

New Electrical Supplies in a Live Data Hall

15 May 2020

Lifecycle Boiler Replacement

Replacement of Heating Services

27 Apr 2020

NHS Nightingale 'Mindful' Space

Fit Out of Small 'Mindful' Space for NHS Workers

12 Apr 2020

UPS Power

Disaster Recovery Works for Covid-19

5 Apr 2020

Disaster Recovery - Moves and Changes

Re-distribution of trading staff due to Covid-19

31 Mar 2020

Generator Replacement

Replacement of the existing Generators in new external compound.

14 Feb 2020

ACC Liverpool - Heat Exchangers

AHU Gas Fired Heat Exchanger Replacement

31 Jan 2020

Essex Data Centre

Annual Planned Preventative Maintenance

14 Dec 2019

Garden of Light

Immersive Lighting Experience at Designer Retail Outlet

30 Nov 2019

Office Floor Refurbishments

Investment Bank Floor Refurbishments

30 Nov 2019

Ashford White Box

White Box Fit Out at Designer Retail Outlet

31 Oct 2019

Fit Out of Retail Units

White Box Fit Outs with Back of House Spaces

30 Sep 2019

De-Energised Maintenance

Full De-Energised Service of Electrical Infrastructure

30 Jun 2019

Data Centre Plant Replacement

Replacement of Live Data Hall Cooling System

30 Jun 2019

LIfecycle Panel Replacement

Replacement of Main LV Panel within Live Data Centre

29 Mar 2019

Data Centre Fit Out

Northolt Data Hall Fit Out