TEGG - Paris Data Centre

Metropolitan was engaged in a 3 year energised proactive & preventative maintenance programme to ensure the integrity of the building’s landlord’s electrical infrastructure.

Working to an SLA & KPI system that ensures minimum guaranteed uptime, to date this has been achieved by using the electrical industry’s leading technologies to fault find on all aspects of the electrical infrastructure associated with critical power systems including lighting, A/C & generator backed life safety systems.

The processes used to ensure maximum electrical infrastructure uptime are Thermography, Ultrasonic, Harmonic studies & Power Quality. Combining all these leading edge technologies gives a complete & comprehensive assessment & report highlighting any issues with the electrical infrastructure that can be rectified under a controlled power outage.