Datacenter Works

Metropolitan Mechanical were awarded a contract to work alongside the incumbent maintenance contractor at Marks & Spencer Data centre. The Project entailed Decommissioning ‘End of Life’ DX down flow units and replace them sequentially as to maintain operation of the data halls.

Metropolitan have taken the design & Build responsibility to utilise the existing chilled water system and offer a new solution, re-routing large chilled water pipework on the comfort cooling chillers.

Metropolitan managed the day to day operations to ensure that program was met in a safe manner. The scope of works included.

  • Validation surveys
  • Electrical supplies
  • Pipe fitting and fabrications
  • Access platforms
  • Plant movements
  • FGas decommissioning
  • Controlled strip out works
  • Installation works
  • Water treatment
  • Test and commissioning

Metropolitan’s attention to detail and professional approach, ensured that this project is delivered to a renowned high standard.