Datacenter Works

Metropolitan Mechanical have been awarded a contract to work alongside the incumbent maintenance contractor at Marks & Spencer Data centre. The Project entails Decommissioning ‘End of Life’ DX down flow units and replace them sequentially as to maintain operation of the machine halls.

Metropolitan have taken the design & Build responsibility to utilise the existing chilled water system and offer a solution re-routing large chilled water pipe work on the comfort cooling chillers.

Metropolitan will manage the day to day operations to ensure that program is met in a safe manner. The scope of works will inc

  • Validation surveys
  • Electrical supplies
  • Pipe fitting and fabrications
  • Access platforms
  • Plant movements
  • F gas decommissioning
  • Controlled strip out works
  • Installation works
  • Water treatment
  • Test and commissioning

Metropolitan’s attention to detail and professional approach will ensure that this project is delivered to a renowned high standard.