Infrastructure upgrade for Credit Suisse

Metropolitan were called upon by ISG to perform a complex electrical infrastructure upgrade for their Client Credit Suisse in Canary Wharf.

The challenge was to complete the upgrade within a LIVE operational trading bank with minimal downtime.
Works included:

  • New Sub-Main Cabling
  • New Switch Panels to alleviate the Rising Bus Bars dependant services
  • Migration of Services from an existing Source to new Switch Panels
  • New Rising Busbar Systems
  • New SER fit outs
  • Modifications to existing PDU main supplies within the Main Data Centre, whilst maintaining constant power, so as not to affect the LIVE Trading and Comms required
  • Structural penetrations for new Electrical Cable and bus bar Risers.
  • SCADA system upgrades
  • New PLC system
  • New BEMS & Critical Breaker monitoring system & Head End Graphic

All works were completed on time and to specification.