Data Centres
-
Duration
6 Weeks Annually
-
Annual Value
£108,000
-
Location
Canary Wharf
Brief
The building was not designed as a DC and therefore the infrastructure was heavily loaded with very little resilience. Many panels were in need of replacement and we’ve been working on very delicate planned schedule for the past four or five years.
Solution
TEGG Service on the entire LV and MV distribution infrastructure including Power Quality Analysis, Ultrasound Surveys, Infrared Imaging.We also carry out supplementary EICR works to all non-essential and back of house supplies on a rolling 5 year schedule. We’ve found many issues on site, some of which if left uncorrected would have resulted in catastrophic failures. We’ve carried out monthly monitoring and reporting of the most serious problems and managed to avoid such failures with a proactive and preventative TEGG approach.