Request a callback

Boardroom table refurbishment

Metropolitan were approached by an elite-level client in financial services regarding the need for a top-of-the-line boardroom table refurbishment in Canary Wharf, London.

The Metropolitan solution

Metropolitan engaged the Fabric division of the company to dismantle the existing boardroom table and remove it from site.

Taking the table back to our dedicated joinery workshop, the Fabric team stripped the table of its existing top surface. They applied a new stain before spraying it with polyurethane lacquer for an increased layer of protection. The purpose of polyurethane lacquer is to not penetrate the wood, but rather give it a surface coat that is durable. This was to ensure the table would not need any future refurbishment for years to come.

Following this, the team polished the table to give its new coat a glossy, deep shine – highlighting the impression of authority befitting its location.

Fabric subsequently wrapped the table for protection, delivered it back to the site and returned it to the boardroom.

This project was completed within two weekends worth of activity, and its completion represented another highly successful project works for our superb joinery team.