Request a callback

Floor Refurbishment Project

Project brief was to create an agile and dynamic workspace.

Removal of partitions to form new breakout area and collaboration zones.

Introduction of new glazed partitions for new layout, with New banks of desking to support agile working, LED lighting, new bespoke furniture, decoration and carpet to complement the scheme.


Electrical

  • Upgrade of existing desking, new desk kits and personal power.
  • Installation of breakout areas.
  • Reconfiguration and upgrade of East and West Vending.
  • Full lighting system upgrade – General switching and 0-10v daylight saving system removed and replaced with full control DALI.
  • Full LED replacement – Existing fittings removed and replaced with LED.
  • Installation of bespoke lighting.
  • Fire Alarm modifications.

Fabric

  • Reconfiguration of existing office space.
  • Full floor carpet replacement.
  • Office modifications, walls, ceilings, floors and decoration.
  • Full floor redecoration.